174 kW system installed for MJ Allen Castings and Machining

In March 2024, we worked closely with MJ Allen Castings and Machining with installing a 174 kW system across multiple industrial buildings in Ashford.

What was installed?

  • 405 Jinko Tiger 430w Solar Panels

  • 9 Solis Inverters

Benefits

  • 124,454 kWh/Year of clean, renewable energy being generated for their industrial units
  • 58,481 kg/year of co2 emissions being avoided to help make Earth a greener place

The Process

MJ Allen Casting and Machining began by crafting patterns in 1958 and now manufacture for the Aerospace, Defence, Automotive and Medical sectors along with general engineering, manufacturing and even decorative markets. Their machine shops and foundries operate alongside their fabricating, painting and assembly facilities – all working seamlessly together in one business.

MJ Allen’s Managing Director, Aaron Walsh and our Business Development Manager, Alex got busy working together, discussing what roofs they wanted the panels to lay on, and what size system they needed to generate the most amount of energy to help power their industrial units.

Once the pre-survey was completed, and we had an understanding what roofs were safe for our solar panel installers and solar PV panels to lay on, we got to work designing a post-design on PVSOL, creating a simulator of how much energy will be generated before the panels were laid.

This entire system has 405 solar PV Panels, covering 809.2 m² of MJ Allen’s roofs, with 9 Solis Inverters which were installed by our team of dedicated solar panel installers and electricians within 3-4 weeks.

We’re not just reducing our carbon footprint, we’re also saving on energy costs! This work is set to pay for itself within 3 – 4 years thanks to our multi-layered business improvements and efficiencies.

We’re proud to do our bit for the environment and pave the way for a brighter, greener future!

MJ Allen Castings and Machining

Contact us online

Simply fill out the form below and a member of our professional team will get back to you as soon as possible. Please ensure you provide as much detail as possible to ensure a more accurate initial quote.

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    Our Address
    South East Solar & Electrical
    Unit 16, Rochester Trade Park, Maidstone Road
    Rochester
    Kent
    ME1 3QY
    Call us
    Opening hours
    Monday 08:30 - 16:30
    Tuesday 08:30 - 16:30
    Wednesday 08:30 - 16:30
    Thursday 08:30 - 16:30
    Friday 08:30 - 16:30